The Heshangzui Coal Mine Exhaust Air Heat Extraction Project is located in Datong, Shanxi Province. It is equipped with four two-stage heat extraction medium-temperature exhaust air heat pump units, two KLMK-STS/S-550/137 and two KLMK-STS/S-480/150, respectively. The water supply temperature is ≥ 50 ℃, which is used for wellhead fresh air heating and bathing hot water. The project was completed and officially put into use in October 2020.
Recommendations
Shaanxi Wenjiapo Mine Exhaust Heat Recovery Project
Ordos Zhuanlongwan Air Shaft Yard Waste Air Heat Recovery Project
Constant temperature and humidity project of Emeishan Grain Depot
Air Purifiers
What are the advantages and disadvantages of distributed central heating with air source heat pumps?
6.29-7.1 CIRE 2022 East China Cold Expo | Kcalin invites you to meet Spring City for the grand event