The clean energy transformation project of coal-fired boiler in Fangshan District Education System covers 19 schools including Qinglonghu Primary School, Jiyang Primary School, Gongyizhuang Primary School, Caozhang Primary School and Zhaogezhuang Primary School, with a total area of about 40000 square meters. The system uses Kcalin air source heat pump to replace the traditional coal-fired boiler for heating. The heating effect is continuous and stable, safe and reliable, clean and environmentally friendly, creating a warm and comfortable learning environment for children, which is highly recognized by teachers and students of the school. The project was completed and officially put into use in October 2015.
Recommendations
Hebei Huashang Printing Plant Air Source Heat Pump Heating Project
Refrigerator room project of National Protein Science Research Base
Qilu University of Technology Library Ventilation and Air Conditioning Project
Fumes Purification
Why do schools choose air source heat pump units when converting coal to electricity
Highlights moment: a thank-you letter from the National Convention and Exhibition Center (Tianjin)